The Neofabii Drama Reels

Wateva SMP · Paper of Record · Season II

Daily EditionJul 27, 2026

The Neofabii Drama Reels

builds

NETHER HIGHWAY PROJECT QUIETLY ABANDONED

Three weeks of promises. Forty-one blocks of tunnel. One very tired volunteer.

By The Newsroom· 1 min read· Names changed to protect the guilty

The much-announced nether highway — promised to link every major base on the server — has stalled at forty-one blocks.

The project was announced to considerable fanfare. A channel was made. A schedule was posted. A colour scheme was debated for two hours.

Construction began. Construction continued for one evening. Construction has not resumed.

One contributor, who asked not to be named, put it plainly: "I dug the whole thing myself. Everyone else logged off to go fight a warden."

The tunnel remains open, well-lit, and entirely pointless.

Letters to the Editor

Nobody has written in about this one yet.

    Sign in with Discord to write to the paper.

    Letters are printed as sent and signed with your Discord name. Anything can be pulled on request.

    A note from the desk

    Is something here wrong, or about you and you'd rather it wasn't? Ask for a correction or takedown. We pull things, no questions asked, no hard feelings.